High-consumption industrial users temporarily disconnect from the electrical system in Ecuador

1 min de lectura
High-consumption industrial users temporarily disconnect from the electrical system in Ecuador

On Monday, November 21, 2026, a weekly power outage schedule begins affecting nearly 150 high-consumption industries, with the aim of preserving hydroelectric reserves and ensuring residential supply.

On Monday, November 21, 2026, an electrical disconnection scheme begins in Ecuador aimed at high-consumption industries. Between 145 and 150 companies in the High Voltage 1 (HV1) segment will be disconnected from the National Interconnected System for one day each week. This measure seeks to preserve the reserves of hydroelectric plants and maintain a stable supply for households.

The action is concentrated in the coastal region, especially in Guayaquil and Durán, which account for about 90% of the affected industries. Companies must coordinate the day of their disconnection and adjust their operations accordingly.

Although the measure implies a temporary restriction for the industrial sector, it is considered essential to avoid outages in homes and protect the electrical system against possible crises, without affecting residential service.

#Ecuador#electricity#industry#energy

Referencias